258 Selby Ave St. Paul - This historic apartment building needed a new deck system for the tenants to utilize for outdoor living space. The resulting design and project seamlessly blends the old brownstone building with a contemporary steel beam and composite decking material selection. The decks are attractive, spacious and durable making this renovation a success.
“Prime General Contractors brought it together for a classic brownstone renovation.”
Project Specs:
258 Selby Ave Building St. Paul, MN
Exterior restoration
Architect: Momentum Design Group
Structural Engineer: Cole C. Janisch Structural Engineering
Project Size: Lower Level, 2nd & 3rd Floor decks and roof structure
Owner: Robert Engstrom Companies
Comments