JCC Parking Lot Utilities - Water Main Replacement

Writer's picture: Derek ClarkinDerek Clarkin

Prime General Contractors was contracted by the Jewish Community Center located in St. Paul, Minnesota, to replace a portion of the facility's water-mains. Wet tap's were performed in a public roadway. This project consisted of replacement of 300 of feet of 4” domestic water main pipe as well as 300 feet of 6” fire suppression water main pipe.


This project was completed during the 2023 fall season. Tie-in work was completed after hours so as to not interrupt water service during working hours. Of note, technical rock excavation and soil correction were required due to bedrock and poor soil conditions.



Companies turn to Prime General Contractors to coordinate significant underground infrastructure utility replacement. Prime does it right.

Project Specs:


Comments


Prime General Contractors Logo.png

Contact Us

1710 Alexander Road
Eagan MN 55121

Mon- Fri:  8am- 5pm

Join the Prime Community

  • Prime General Contractors on LinkedIn
  • Prime General Contractors on YouTube
  • Google Review for Prime General Contractors

For proposals or any inquiry, contact us

Thanks for submitting!

© 2022-2023 Prime General Contractors LLC. All rights reserved. Images used with permission.

Your privacy is important to us. This is a secure site using encrypted Secure Socket Layer technology.

Your data is safe and will not be shared.

bottom of page