top of page

Complete: Knollwood Place Apartments Floors 4-6 Refinishing

Writer's picture: Derek ClarkinDerek Clarkin

Prime General Contractors LLC was invited to be a part of the construction team for Floors 4 to 6 improvements at Knollwood Place Apartments, a Sholom property.

Knollwood Place offers 153 beautifully appointed one- and two-bedroom apartment homes.


Floors 4-6 resident corridors received new finishes. This included flooring replacement, refinishing of wall surfaces and trim refinishing. Additionally, the popcorn ceiling finish was removed and redone with knock-down texture and painted. Existing light fixtures were replaced, new window treatments installed, and resident doors and handrails were refinished.


Prime General Contractors had previously completed the other floors in 2022.


On the main level all common spaces received new flooring, wall finishes and light fixtures. A multi-purpose pantry and staff break room was renovated with new cabinetry, countertops, plumbing fixtures and appliances.



Located on the 17-acre Ackerberg Family Sholom West Campus in Saint Louis Park, Knollwood Place Apartments is a vibrant and welcoming older adult community.


Prime General Contractors completed this property's interior facelift with little to no disruption of resident's lifestyles and staff workflows. We were very pleased!

Project Specs:


Comments


Prime General Contractors Logo.png

Contact Us

1710 Alexander Road
Eagan MN 55121

Mon- Fri:  8am- 5pm

Join the Prime Community

  • Prime General Contractors on LinkedIn
  • Prime General Contractors on YouTube
  • Google Review for Prime General Contractors

For proposals or any inquiry, contact us

Thanks for submitting!

© 2022-2023 Prime General Contractors LLC. All rights reserved. Images used with permission.

Your privacy is important to us. This is a secure site using encrypted Secure Socket Layer technology.

Your data is safe and will not be shared.

bottom of page